Challenges Through Data Center Migration

Posted byVijay Gupta18/06/20240 Comment(s)

Whether it's due to geographical changes, resource consolidation, or expanding cloud services for better business continuity, data center migration is a common practice. However, these migrations are complex, risky, and costly, often disrupted by unforeseen challenges. This article explores the hidden challenges of data center migration to help organizations better understand and manage this complex task, ensuring a smooth and successful implementation.

 

Unplanned Downtime

Unplanned downtime is a major concern during data center migration, potentially impacting customer usage and increasing business losses. To avoid service disruptions, develop a phased migration plan for data and applications, ensuring quick correction and rollback capabilities if issues arise.

 

Data migration typically involves three key steps:

 

1. Extract: Identify what needs to be migrated, including physical hardware, its source, and format. Extract this data to a temporary storage area, often known as an extraction tier or staging area.

 

2. Transform: Make structural and content changes to the extracted data, such as cleaning, filtering, normalizing, renaming columns, and calculating new fields. This ensures the data is suitable for the target system's structure and requirements, maintaining consistency, quality, and conformity.

 

3. Load: For new hardware deployments, inject the processed data into the target system to ensure accuracy and availability.

 

Adopt a step-by-step migration approach by first moving part of the system to the new data center to verify stability and performance before gradually migrating other systems.

 

Data Loss

The worst-case scenario during a data center migration is losing critical data, which can occur due to network security lapses, hardware failure, or inadvertent data-handling errors. To prevent this, ensure comprehensive data backups before migration, including redundant backups stored in the cloud or on isolated local servers. Utilize redundant storage and fault-tolerance mechanisms to safeguard data.

 

Server Latency

Latency is often underestimated but crucial, especially for IoT devices, e-commerce sites, video streaming solutions, and cloud gaming. A few seconds of latency can severely damage your business and brand reputation. Optimize your new data center network architecture for low latency and high bandwidth using specialized network equipment, CDNs, and WAN optimization. Choose a migration location close to users or critical operations to minimize data transfer distance and latency. Schedule migrations during business valleys or non-critical times to minimize user impact.

 

Security

Data and application migration to a new data center involves significant security risks. Address these on a case-by-case basis, implementing measures to ensure long-term data and application security at the new site. Key risks and responses include:

- Data Breaches: Implement data encryption, access control, and monitoring to prevent unauthorized access.

- Physical Security: Secure physical devices and storage media during the move to prevent theft or damage.

- Network Security: Review the new network architecture for security, using firewalls and intrusion detection systems to protect data during and after migration.

- Compliance: Ensure the new data center meets relevant regulations and standards to avoid compliance risks.

 

Migrating to a new data center or cloud environment involves numerous challenges. Careful planning, strong technical support, and close teamwork are essential for a successful, efficient, and secure migration. Overcoming these challenges ensures business continuity and reliability during and after the migration process.

Track Order